Why AZS Block Quotes Differ and How to Compare Them

Nov 20, 2026

Leave a message

Two quotations both say AZS 41, but their totals differ. Before choosing the lower figure, ask whether they cover the same finished blocks and the same acceptance requirements. Equally, a higher price is not proof of better quality. A useful comparison makes the differences visible before the order is placed.

info-800-560

Port-block preassembly shown in Dezhong company materials. Shapes, block numbers and assembly scope belong to a defined project.

 

Fused cast alumina-zirconia-silica (AZS) blocks are often supplied to project drawings. The grade name is only part of that specification. Block geometry, internal-quality requirements, machining, inspection and delivery scope can all differ between offers.

 

 

Start with one approved enquiry package. Ask each supplier to identify what is included, excluded or still provisional. Then compare price on that common basis.

 

Put both offers on the same basis

Use the following checks before ranking suppliers by unit price. An unanswered field is a clarification item, not evidence that the service is included or that its cost is zero.

Compare

Confirm in both offers

Order scope

Same drawing revision, block IDs, quantities and spares.

Material

Grade, agreed properties and internal-quality requirements.

Finished geometry

Dimensions, tolerances, openings, machined faces and assembly scope.

Quality evidence

Tests, sampling or coverage, report type and acceptance basis.

Price basis

Currency, per-piece or weight basis, billable quantity and exclusions.

Delivery scope

Packing, named delivery point, transport scope and schedule assumptions.

If one offer uses an older drawing, includes fewer spare blocks or omits a requested inspection, ask for a revised quotation. Keep the original offer and the written clarification together so technical and purchasing teams review the same version.

 

 

A proposed alternative can be worthwhile, but list it separately from the compliant offer. Have the responsible designer or technical team approve any material or geometry change before treating it as equivalent.

 

 

Compare finished blocks rather than tonnes alone

For a custom block, confirm what will be delivered: the final dimensions, relevant tolerances, openings and required faces. Two orders with similar weight may contain very different numbers of shapes and machining operations. Ask suppliers to identify any shape-specific charges or exclusions.

info-800-560

 

Block cutting equipment in the Dezhong workshop. Specify the required finished geometry and machining scope in the enquiry.

 

More machining is not automatically better. The objective is the agreed geometry and joint requirements for the application, not simply the smoothest-looking surface. Published AZS work treats internal filling and joint-face condition as separate performance considerations; neither is defined by the grade label alone.

 

Technical reference :SEFPRO on AZS filling and joint-face quality

For weight-based offers, state whether settlement uses agreed theoretical weight or actual finished-product net weight. Reconcile that basis with the block list. Package gross weight used for transport must not be mistaken for the agreed billable brick weight.

 

 

Make quality evidence part of the quotation

A typical datasheet, a production-batch report and a block-specific inspection record are not interchangeable. Ask which documents will accompany the order and how their sample or block IDs connect to the delivered material.

 

info-800-560

Internal inspection of a new refractory block at Dezhong. Agree inspection coverage, reporting and acceptance requirements for the order.

 

Dezhong has XRF chemical analysis, bulk-density and apparent-porosity testing, glassy-phase exudation, static and dynamic glass-corrosion testing, and radar internal-inspection capability. The tests, sampling and coverage required for a specific order should be agreed in the quotation and acceptance plan.

 

 

Compare results only after checking the method, specimen, conditions, units and acceptance basis. Chemical composition does not replace a corrosion test, and a laboratory result does not establish the internal condition of every block. An equipment photograph demonstrates neither a batch result nor acceptance of your order.

 

 

Technical reference :REFEL on distinct refractory laboratory tests

 

Compare the complete offer before deciding

Separate confirmed costs from open items

Compare the same quantities, currency and delivery scope. Confirm packing, transport, any separately requested inspection and destination-related costs with the responsible parties. Mark each item as included, excluded or provisional, avoiding double counting. Keep quote validity and payment timing visible.

 

Check the delivery assumptions

Dezhong formally schedules production after drawing approval and receipt of the agreed advance. Normal production for these customized fused cast orders is around 40 days, subject to confirmation. The balance is settled before shipment after agreed acceptance; the port is agreed per order. Production time is not the same as arrival time at your plant.

 

Ask for evidence behind performance claims

Claims of longer furnace life or lower glass-defect rates need relevant evidence and operating context. Do not convert an unsupported service-life claim into a precise cost saving. Once technical requirements are met, weigh documented differences against the actual needs of the project.

 

Request a clearly scoped AZS quotation

Send your current drawings, block list, furnace position, glass type, technical requirements and required delivery date to zzdz@dzrefactory.com. Tell us which inspections and documents you need. Dezhong can review the requirements and clarify the supply scope before preparing an order-specific offer.

 

Send Inquiry